Back to Parent

Prototype (Design Logic system + Hardware + Apps and Online Service)

The building instructions are divided into four parts. First, I set a MVP(A minimum viable product) before begin to design product: 60-75°F based on the research. 


Content Rating

Is this a good/useful/informative piece of content to include in the project? Have your say!

0